Dual occupancy · In progress

Concord

Two new contemporary homes replacing a single dwelling on a generous suburban block, designed for modern family living with private gardens for each.

Project type
Dual occupancy
Location
Concord, NSW
Our role
Builder
Current phase
Slab
Aerial view of the cleared Concord site with the bay beyond

Project timeline

Stage 5 of 7 · Waffle-pod slab being prepared

  1. Existing site
  2. Design & approvals
  3. Demolition
  4. Site works
  5. Slab & structure
  6. Framing & roof
  7. Fitout & handover
  1. Jul – Nov 2025

    Stage 1 · Complete

    The existing site

    Drone survey and site tour of the original house and garden to plan the new development.

    Front of the original houseOvergrown side garden of the original houseOriginal enclosed sunroom
  2. 2025 – 2026

    Stage 2 · Complete

    Site analysis, design & approvals

    Drone survey and site analysis informed the design of the two new homes, followed by approvals and coordination with neighbours.

    Top-down drone view of the original siteAerial view of the site and its neighboursNeighbourhood context from above
  3. Oct 2026

    Stage 3 · Complete

    Demolition & site clearing

    The existing house removed and the site cleared, levelled and secured for construction.

    Top-down view of the cleared siteCleared and fenced site from aboveCleared site between neighbouring homes
  4. Nov 2026

    Stage 4 · Complete

    Site works & stormwater

    Set-out, piering and in-ground stormwater drainage, including the easement arrangements with neighbours.

    Site set-out and piers from aboveFooting trenches and set-outTop-down view of the prepared site
  5. Late Nov 2026 – now

    Stage 5 · Current stage

    Slab & structure

    Waffle pods and reinforcement laid out for the ground slabs of both homes, ready for the concrete pour, followed by the structural frame.

    Waffle-pod slab set out across the siteWaffle pods and reinforcement from aboveSlab preparation for both homes
  6. Upcoming

    Stage 6 · Upcoming

    Framing & roofing

    Wall and roof framing, roofing and windows, bringing both homes to lock-up.

    Photos will be added as this stage begins
  7. Upcoming

    Stage 7 · Upcoming

    Fitout, finishes & handover

    Services, linings, kitchens, bathrooms, landscaping and final inspections before handover.

    Photos will be added as this stage begins

Thinking about a dual occupancy?

Start with a free consultation to talk through your site, budget and timeline.

Book a consultation View all projects