Residential · In progress

East Killara

A major renovation of a two-storey family home on the Upper North Shore, reworking the structure, roof and interiors to create a modern home for the next generation.

Project type
Major renovation
Location
East Killara, NSW
Our role
Builder
Started
February 2026
Aerial view of the new timber roof framing with scaffolding around the home

Project timeline

Stage 4 of 7 · Roof tiling underway

  1. Existing home
  2. Demolition
  3. Structure
  4. Roofing
  5. Rough-in
  6. Interior fitout
  7. Finishes
  1. Feb 2026

    Stage 1 · Complete

    The existing home

    Site survey, dilapidation records and site set-up. We documented the original house in detail before any work began.

    Front of the original two-storey homeRear of the original home and poolAerial view of the original home
  2. Mar – Apr 2026

    Stage 2 · Complete

    Demolition & strip-out

    Ceilings, internal walls and finishes removed back to the structure, keeping the parts of the original house worth retaining.

    Living area stripped back to the slab and roof timbersRoom stripped with ceiling removed and props installedAerial view of the home stripped to its walls
  3. Apr – Aug 2026

    Stage 3 · Complete

    Structural works

    New brickwork to form the revised layout and upper level, followed by the new upper-floor concrete slab.

    Aerial view of new brick walls risingNew internal brickworkNewly poured upper-floor slab
  4. Sep 2026 – now

    Stage 4 · Current stage

    Roofing

    New timber roof framing is complete, with sarking and roof tiles now being laid to bring the home to lock-up.

    New timber roof trusses in placeAerial view of roof sarking and tiling in progressClose-up of new dark roof tiles
  5. Upcoming

    Stage 5 · Upcoming

    Services rough-in

    Electrical, plumbing, data and mechanical services run through the frame before walls and ceilings are lined.

    Photos will be added as this stage begins
  6. Upcoming

    Stage 6 · Upcoming

    Interior fitout

    Plasterboard linings, joinery, tiling, kitchen and bathroom installation.

    Photos will be added as this stage begins
  7. Upcoming

    Stage 7 · Upcoming

    Finishes & handover

    Painting, final fit-off, landscaping, inspections and the Occupation Certificate, then the keys are handed over.

    Photos will be added as this stage begins