New home · Pre-construction

Lidcombe

A knockdown-rebuild of a family home in Lidcombe, replacing the original house with a new contemporary home and a separate granny flat on a deep suburban block.

Project type
Knockdown rebuild + granny flat
Location
Lidcombe, NSW
Our role
Design & construction
Status
Design approved
Aerial view of the Lidcombe site and street

Project timeline

Stage 3 of 7 · Preparing for construction

  1. Existing home
  2. Design & approvals
  3. Pre-construction
  4. Demolition
  5. Slab & structure
  6. Framing & roof
  7. Fitout & handover
  1. Feb 2026

    Stage 1 · Complete

    The existing home

    Drone survey and site review of the original house, its roof and the deep rear yard.

    Street view of the original houseAerial view of the original house and drivewayOriginal roof from above
  2. 2026

    Stage 2 · Complete

    Design & approvals

    Design of the new home and granny flat to make the most of the long block, through to design approval.

    Top-down view of the site and its neighboursThe street from aboveThe rear yard from above, where the granny flat will sit
  3. Late 2026 – now

    Stage 3 · Current stage

    Pre-construction & Construction Certificate

    Final documentation, engineering and certification, with construction scheduled to start soon.

    Aerial view of the site from the streetRear yard from above
    More photos soon
  4. Upcoming

    Stage 4 · Upcoming

    Demolition & site works

    Clearing the site and preparing for the new home, including set-out and services connections.

    Photos will be added as this stage begins
  5. Upcoming

    Stage 5 · Upcoming

    Slab & structure

    Footings and slab for the new home and granny flat, followed by the structural frame.

    Photos will be added as this stage begins
  6. Upcoming

    Stage 6 · Upcoming

    Framing, roofing & lock-up

    Wall and roof framing, roofing and windows, bringing both buildings to lock-up.

    Photos will be added as this stage begins
  7. Upcoming

    Stage 7 · Upcoming

    Fitout, finishes & handover

    Services, linings, kitchens, bathrooms, landscaping and final inspections before handover.

    Photos will be added as this stage begins