Mia Mia
← All projects

Shop-top housing · In progress

Pyrmont

The conversion of a characterful brick-and-sandstone building into shop-top housing, with a ground-floor commercial space and a generous home above, while respecting its heritage street presence.

Project type
Shop-top housing conversion
Location
Pyrmont, NSW
Our role
Design & construction management
Current phase
Approvals
The heritage Harris Street facade with its red front door

Project timeline

Stage 3 of 7 · DA modification and site investigations underway

  1. Existing building
  2. Design & DA
  3. Approvals
  4. CC
  5. Strip-out & structure
  6. Services & fitout
  7. Finishes & OC
  1. 2024 – Sep 2026

    Stage 1 · Complete

    The existing building

    Measured survey, drone inspection and condition review of the existing brick building, its vaulted upper level and rear laneway access.

    Brick gable and pergola from aboveExisting upper level under the vaulted timber ceilingRear lane frontage and garage
  2. Approved Jun 2026

    Stage 2 · Complete

    Design & development application

    Concept design for the shop-top conversion and development approval from council for the change of use, respecting the building's heritage setting.

    Harris Street frontageAerial view of the roof and neighbouring buildingsAerial view across Pyrmont
  3. Nov 2026 – now

    Stage 3 · Current stage

    DA modification & site investigations

    Refining the approved design, including the layout of the upper-level home, with investigation openings to confirm the existing structure and a detailed construction cost estimate.

    Upper level with arched gothic windowsInvestigation opening in the ceiling exposing the original structureSide passage along the original brick wall
  4. Upcoming

    Stage 4 · Upcoming

    Construction Certificate

    Engaging the certifier, finalising structural and services engineering, and issuing the Construction Certificate.

    Photos will be added as this stage begins
  5. Upcoming

    Stage 5 · Upcoming

    Strip-out & structural works

    Careful strip-out and structural upgrades to suit the new layout, retaining the building's character.

    Photos will be added as this stage begins
  6. Upcoming

    Stage 6 · Upcoming

    Services & interior fitout

    New services, linings, joinery, kitchen and bathrooms for the home and the ground-floor tenancy.

    Photos will be added as this stage begins
  7. Upcoming

    Stage 7 · Upcoming

    Finishes & Occupation Certificate

    Final finishes, inspections and the Occupation Certificate, ready for occupation.

    Photos will be added as this stage begins

Have a building with conversion potential?

Start with a free consultation to talk through your site, budget and timeline.

Book a consultation View all projects